Frequently Asked Questions
How long does a diaphragm wall project take?+
Project duration varies based on wall depth, length, and soil conditions. A typical diaphragm wall project may take 3-6 months. We'll provide a detailed timeline with your quote.
Do you offer free site assessments?+
Yes! We provide free site assessments and consultations. Our engineering team will visit your site, analyze soil conditions, and provide a detailed scope and estimate.
What equipment do you operate?+
We operate international-standard machinery including 4 hydraulic rigs, 3 hydraulic cranes (45-80MT), 6 crawler cranes (18-35MT), 2 crawler anchor rigs, and 20 polymer tanks.
What safety standards do you follow?+
Our goal is zero incidents through effective safety management. All injuries and illnesses are preventable. We investigate all incidents and near misses to prevent recurrence.
What depth can you achieve?+
We can construct diaphragm walls with thickness of 300mm to 1500mm, up to a depth of 50 meters. Our equipment handles even the most challenging soil conditions.